Background: Nuovo Foods Ltd

Nuovo Foods Ltd is a leading fast moving consumer goods (FMCG) distribution company specialising in Asian food and beverages. The company operates across the United Kingdom and Europe, serving a wide range of retailers and food service providers.

In 2023, Nuovo Foods acquired an 85,000 sq. ft distribution warehouse in West Bromwich, strategically located to serve as a fully racked central distribution hub, enhancing their ability to meet growing customer demand nationwide.

Project Overview: Total Interiors Direct’s Role

Total Interiors Direct was engaged by Nuovo Foods Ltd to design, supply, deliver, and install a comprehensive pallet racking solution for their newly acquired warehouse.

The primary goal was to optimise the warehouse space for efficient storage and distribution, ensuring safety and accessibility throughout the facility.

Project Scope and Execution

  • Installation Details: We installed racking systems with frame heights ranging from 7,000mm to 10,500mm and beam spans between 3,400mm to 3,600mm. This included single and double-faced runs across multiple aisles, specifically tailored to meet the operational needs of Nuovo Foods Ltd.
  • Forklift Accessibility: To enhance operational efficiency, specialised forklift bay arches of 3,600mm were incorporated, allowing seamless movement of goods throughout the warehouse.
  • Safety Features: To ensure compliance with safety regulations, column guards, SEMA safety load notices, and timber decks were installed to provide a secure environment for pallet storage. Additionally, 15 long barriers were fitted to protect key operational areas.
  • Protective Barriers: An Armco barrier was installed to safeguard the sprinkler pipework, ensuring the longevity of critical fire safety systems within the facility.
  • Health & Safety Compliance: A comprehensive risk assessment, health and safety policy, and method statement were provided, underscoring our commitment to maintaining the highest safety standards throughout the project.
  • Project Timeline: Despite the complexity of the installation, the entire project was completed within 15 working days, showcasing our team’s efficiency and dedication.

Outcome & Customer Thoughts

The project was completed on time, meeting all the specific requirements outlined by Nuovo Foods Ltd. Our tailored racking solution enabled them to maximise their storage capacity and streamline their distribution processes, significantly enhancing their operational capabilities.

“We are extremely pleased with the work carried out by Total Interiors. Jerry and the team demonstrated professionalism and efficiency, delivering exactly what we needed to optimise our new distribution hub. The racking installation was completed on time and met our exacting standards. We highly recommend them for any warehouse racking and storage solutions.” — Gohar Khan, Nuovo Foods Ltd.